What does Afcec stand for Air Force?

What does Afcec stand for Air Force?

Air Force Civil Engineer Center
The Air Force Civil Engineer Center (AFCEC), located at Joint Base San Antonio-Lackland, Texas, is a 1,900-person primary subordinate unit, assigned to Air Force Materiel Command and attached to the Air Force Installation and Mission Support Center-Provisional.

What does Afcec stand for?

AFCEC

Acronym Definition
AFCEC Air Force Civil Engineer Center (US Air Force)

How long is civil engineering tech school for the Air Force?

OTS is a 12-week development course that you can only be eligible for after completing four years of college. While enrolled in OTS, candidates will learn the skills that focus their careers in military organization and the support of combat operations.

What are the directorates of the Air Force Civil Engineer Center?

Operations Directorate (CO) Asset Visibility (COA) Force Development (COF) Civil Engineer Maintenance, Inspection and Repair (COM) Operations Maintenance (COO)

How often do Air Force civil engineers get deployed?

You will deploy between 2 to 6 months a year or every other year, depending on your MWS. Always have your 72-hour “Go Bag” ready! Required Training. Typically, one month of Initial Flight Training (IFT), 1-1.5 years at Undergraduate Combat Systems Officer training, and 4-12 months at your airframe follow-on training.

What is a civil engineer squadron?

The United States Air Force maintains a number of civil engineering units in the form of United States Air Force civil engineering squadrons. In wartime, they provide for the rapid repair of damage to airfields and other critical facilities.

Who does Afcec fall under?

The Air Force Civil Engineer Center (AFCEC), with its headquarters in San Antonio, Texas, is a Primary Subordinate Unit to the Air Force Installation and Mission Support Center (AFIMSC), assigned to the Air Force Materiel Command.

What is Air Force deployment like?

Most Air Force deployments involve flying to another location, often an overseas Air Force base, a joint base or the base of another service. Airmen may live on those bases or stay in hotels. Some Air Force units have a faster deployment cycle, with shorter deployments and shorter times between deployments.

What is the Logistics Readiness Squadron?

The Logistics Readiness Squadron is the ultimate logistics organization, combining planning, supply and transportation skills into one organization, under one commander, with all the resources to keep pace with the swift demands of deployment, employment, and sustainment support requirements.

Where is Disa global field command in Illinois?

This 4 day seminar is held at DISA Global Field Command, Scott Air Force Base, Illinois and covers web telecommunications request processes. During the course, students will receive information to facilitate the ordering and life cycle management of their communications requirements.

What can I learn from a Disa course?

During the course, students will receive information to facilitate the ordering and life cycle management of their communications requirements. Other presentations include the DISA Network, Defense Switched Network, DISN Router Service, and several other briefings related to the provisioning process.

How to contact the Air Force Civil Engineer Support Agency?

The directorate also operates the AFCESA Reach-Back Center, which provides rapid response to questions from civil engineers in the field (the center can be reached at 1-888-AFCESA1; DSN 523-6995, International DSN 312-523-6995 or via the web at www.afcesa.af.mil ).

What do you need to know about Disa global telecommunications?

The DISA Global Telecommunications Seminar is designed for the person who needs a basic understanding of the DISA provisioning process and requires the ability to submit/manage their unified capabilities requirements.