How many items rates are involved in CPWD Sor?

How many items rates are involved in CPWD Sor?

Hence, the SOR serves as an important document for the CPWD. The CPWD schedule of rates contains the basic rates of materials, labour, carriage etc. of about more than 2500 items and the finished rates of about 3000 items of works covered under different subheads like Building work, Concrete work, water supply etc.

What is Schedule B in tender?

Part B:- General/specific conditions, specifications and schedule of quantities applicable to major component of the work. It will be obligatory on the part of the tenderer to sign the tender Page 10 document for all the components (The schedule of quantities, conditions and special conditions etc.) 16.1.

What is Delhi Schedule of rates?

Delhi Schedule of Rates 2012 is based on the prevailing market rates of materials in Delhi between April 2011 to Sept. 2011. The labour rates adopted are as per minimum wages issued by Govt. of Delhi w.e.f. 1/4/2011.

In which schedule the work of excavation in foundation is an item?

The item in the schedule of quantities shall specify the excavation in trenches or over areas. For this purpose, the excavation for any depth in trenches for foundation not exceeding 1.5m in width or 10sqm. on plan shall be described as excavation in foundation trenches.

How many Mazdoor or helper is required per Mason for brickwork?

SNo. Particulars of items Quantity
45. Excavation in soil 1.00cum
46. Number of bricks laid by a mason in brick work upto a height of 3m(10”) 600 bricks per mason
47. Amount of work done by a mazdoor helper per day
Mix 3.00cum

What is a tender schedule?

Tender Schedule means collectively the tender documents, specifications, agreed variations, if any, as such other documents constituting the tender and acceptance thereof.

What is work schedule?

Schedules of work (or schedule of works) are ‘without quantities’ instructional lists often produced on smaller projects or for alteration work. Schedules of work are typically prepared by designers rather than by a cost consultant or quantity surveyor.

What is the full form of CPWD?

Central Public Works Department. For Excellence In Public Works.

What do you infer from Schedule of Rates?

All the Governments / Departments every year prepare and update rates of normally used building items / Materials / works item. Number of such items may range from 500 to 1000. This is called Schedule of Rates. This will curtail the discretionary power of officers and will act as a check on their powers.

How big is the CPWD schedule of rates?

The CPWD schedule of rates contains the basic rates of materials, labour, carriage etc. of about more than 2500 items and the finished rates of about 3000 items of works covered under different subheads like Building work, Concrete work, water supply etc.

What do you need to know about CPWD tenders?

CPWD Tenders are given for supplying materials to official activities like development of canals, dams, streets, highways and the private and non-private projects. If you need any further help with respect to the enrollment and documentation process, sign on to offer help and subscribe Bid Assist.

Is the PWD schedule of rates used as a guide?

Apart from state PWD, this Schedule of Rates is being used as a guide by a number of departments, public sector undertakings, private builders, architects etc. The state PWD will welcome comments on this Schedule of Rates and Analysis of Rates from the users for improvement in future publication.

What are the obligations of the CPWD Department?

Obligations of CPWD-The CPWD offices in every one of the states have nearly similar requirements, which incorporates: Design and Construction of every single open work embraced by Government, Design and Development of Roads, Safety and offices gave on Roads, Development and rebuilding of government structures, Restructuring of Forts and Museum.