What is time dependent SAP?

What is time dependent SAP?

Answer 1 : Time dependent condiction : Conditions which are applicable based on time . Like in Info records and Contracts we mention the validity period of the conditions . For different validity period different conditions may apply making them time dependent .

What is time dependent attributes in SAP BW?

For tracking history/changes in assignment of attribute value to main characteristic, time-dependency can be defined in SAP BW. It enables to maintain changing values of attributes based on time period.

What is time dependent and time independent conditions in SAP?

Time dependant conditions are valid during the time periods maintained in the purchasing documents. Whereas time independent conditions don’t have any time restrictions. Time dependant conditions are maintained in info records and contracts.

What is time dependent master data?

When you select time-dependent master data with attributes, the list displays the texts that are valid until the end of the validity period of the characteristic value. When you change and enter new texts, the lists are updated. Master data must exist between the period of 01.01. 1000 and 12.31.

What is time dependent attribute?

Time Dependent attributes means attributes which can changes For eg: Designation, Salary, Address etc, Navigational Attribuites: Using this we can apply drill down, drill across, restrict navigational attributes.

What is PB00 and PBxx?

PB00 is the price entered manually in the info record. When no PB00 is found, the standard pricing procedures look if there has already been created a purchase order. If so, it tries to copy the price of the last purchase order. This is noted in the purchase order as PBxx. PR00 is the standard sales price.

What is access sequence in SAP MM?

An access sequence is a search strategy that the system uses to find valid data for a particular condition type. The accesses tell the system where to look first, second, and so on, until it finds a valid condition record. You specify an access sequence for each condition type for which you create condition records.

What is condition type PB00?

PB00 – this condition is determined via access sequence from info record or contract or SA or RFQ etc. means if any record for material and vendor is defined then system will search that record first and pull the price of PB00 in the Purchase Order.

What is calculation schema in SAP MM?

A calculation schema is a structure in SAP that logically combines a number of different pricing conditions that should come appear one after another in a purchasing document. You can configure various calculation schemes and include different SAP MM pricing conditions in them.

How do I view an access sequence in SAP?

Go to SPRO → IMG → Sales and Distribution → Basic Functions → Pricing → Pricing Control → Define Access Sequences.

What is PB00 and PBXX?

When to use time dependent text in Bex?

When executing a query time-dependent text/attribute values will be displayed in accordance to the key date used by the query. The query key date to be used can be defined during query design time (Bex QueryDesigner, BWMT – BW Modeling Tools).

When to use time dependency in chracteristics?

Once time-dependency is used for texts/attributes of chracteristics, it is possible to define the validity of text or attritbute value by maintaining the corresponding DATEFROM and DATETO fields. The latter fields are getting added automatically once time-dependency is active.

Is the profit center of a Copa document time dependent?

Suppose we have a scenario in which we want to read the Profit Center of a COPA document based on its posting date.The target does not contain the posting date field. Now profit center (0PROFIT_CTR) is an attribute of 0COSTCENTER and it is time dependent.